What's the new logic of Batch Management at Plant level indicator in 1809 and going forward?
With the introduction SAP S/4HANA 1809, SAP provides a more flexible solution in batch management. A new feature has been introduced as a new field in material master, batch management required indicator (Plant).
Business can activate the batch management for materials (batch level = material) but deactivate the batch management at plant level. This functionality has outstretched the usage of batch management, with material being managed in batches in 1 plant and simultaneously it can be non-batch managed in another plants. The ownership of using batch management now can be controlled from plants. Prior to S/4 HANA 1809, if a product is batch managed and level of activation is at material level, then all the plants were affected with this.
Sometimes business requires to keep batch managed product in Production plant but during Cross plant STOs to distribution plant, Batch should be switched off or should be switched on Selected plants. This feature gives a leverage to work with batch management in One plant and non-batch management in another plant, so this switch is controlling at Plant level which earlier was unable prior to S/4 HANA 1809.
In below example,
SAP has given a new field in material master to activate the batch management for the required plant only.
New configuration is provided to enable or disable these settings in OCHA. Batch level will be activated at material level for the required plant, however if it required to deactivate the settings, selected plant can be deactivated so that inventory will not be at batch level.
Take a test.
Transfer a batch stock from MPRL plant (Batch Managed) to PL01 (Non batch managed). However, Material is activated as batch managed.
Conduct Stock transfer between 2 plants either by STO or by 2 step stock transfer (303, 305).
Stock is transferred from MRPL to PL01 without batch.
This functionality will enhance the business requirement to keep batch stock in one plant and without batch in another if multiple plants operate in stock transfer scenarios like production plant and distribution plants.
2749538 - SAP Extended Warehouse Management version 9.5 may have problems with batch management in SAP S/4HANA 1809 and higher.
2604990 - Batch on Material Level with Deactivated Batch Requirement for certain Plants for EWM 9.5 integrated with S/4HANA 1805 CE / 1809 OP and later
Thanks for going through the blog, do share your feedback or any correction in this regard.
Best regards
Shailesh Mishra
With the introduction SAP S/4HANA 1809, SAP provides a more flexible solution in batch management. A new feature has been introduced as a new field in material master, batch management required indicator (Plant).
Business can activate the batch management for materials (batch level = material) but deactivate the batch management at plant level. This functionality has outstretched the usage of batch management, with material being managed in batches in 1 plant and simultaneously it can be non-batch managed in another plants. The ownership of using batch management now can be controlled from plants. Prior to S/4 HANA 1809, if a product is batch managed and level of activation is at material level, then all the plants were affected with this.
Sometimes business requires to keep batch managed product in Production plant but during Cross plant STOs to distribution plant, Batch should be switched off or should be switched on Selected plants. This feature gives a leverage to work with batch management in One plant and non-batch management in another plant, so this switch is controlling at Plant level which earlier was unable prior to S/4 HANA 1809.
In below example,
SAP has given a new field in material master to activate the batch management for the required plant only.
New configuration is provided to enable or disable these settings in OCHA. Batch level will be activated at material level for the required plant, however if it required to deactivate the settings, selected plant can be deactivated so that inventory will not be at batch level.
Take a test.
Transfer a batch stock from MPRL plant (Batch Managed) to PL01 (Non batch managed). However, Material is activated as batch managed.
Conduct Stock transfer between 2 plants either by STO or by 2 step stock transfer (303, 305).
Stock is transferred from MRPL to PL01 without batch.
This functionality will enhance the business requirement to keep batch stock in one plant and without batch in another if multiple plants operate in stock transfer scenarios like production plant and distribution plants.
2749538 - SAP Extended Warehouse Management version 9.5 may have problems with batch management in SAP S/4HANA 1809 and higher.
2604990 - Batch on Material Level with Deactivated Batch Requirement for certain Plants for EWM 9.5 integrated with S/4HANA 1805 CE / 1809 OP and later
Thanks for going through the blog, do share your feedback or any correction in this regard.
Best regards
Shailesh Mishra